Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 34 results ...

Al-Aubaidy, N A (2015) Factors affecting underreporting of construction safety incidents on capital projects, Unpublished PhD Thesis, , The University of Texas at Austin.

Beg, M A (1999) An economic based decision support system for project level pavement type selection, Unpublished PhD Thesis, , The University of Texas at Austin.

Brandenburg, S G (2004) The Tier I workforce management strategy: Concept and application, Unpublished PhD Thesis, , The University of Texas at Austin.

Castaneda-Maza, J A (2002) Workers' skills and receptiveness to operate under the Tier II construction management strategy, Unpublished PhD Thesis, , The University of Texas at Austin.

Chang, S-W (2002) Development and assessment of the Tier II work force strategy implementation index, Unpublished PhD Thesis, , The University of Texas at Austin.

  • Type: Thesis
  • Keywords: education; skills; crafts; wages; safety; training; project performance
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305473821
  • Abstract:
    The construction industry has been experiencing a major challenge in its work force, “the shortage of skilled craft workers.” This problem has been caused by several factors such as the poor image of the construction industry, lack of training and education, unclear career path, declining wages, and changing work force demographics. A “step-change” approach called the “Two-Tier Work Force Strategy” has been proposed by the Center for Construction Industry Studies (CCIS) Work Force Research Team to deal with the work force related issues in a radical way. It is composed of two separate strategies, Tier I and II, and will provide a structure for long-term progress toward an improved work force. This research characterizes the Tier II Work Force Strategy and develops its Implementation Index to measure the level of Tier II strategy implementation on projects. The Tier II strategy utilizes fewer, better-educated, and higher skilled workers who perform some lower-management functions in addition to craft functions. They are paid more, but produce more through higher skills, stay on the job longer through multiskilling, and deliver improved project performance in safety, quality, schedule, and cost. The Tier II Work Force Strategy Implementation Index is composed of two major divisions: (1) Individual Worker Skills Index and (2) Tier II Project Index. The Individual Worker Skills Index assesses the skill level of an individual worker in both technical and management skills. The Tier II Project Index is divided into two parts: Project Workers Characteristics and Project Execution. The Project Workers Characteristics part assesses the skills of key crafts on a project regarding their technical and management skills. The Project Execution part assesses the effective use of skilled workers in executing the project and is divided into three categories: IT Utilization, Craft Utilization, and Organization. Validation of the Tier II Work Force Strategy Implementation Index as a viable tool is a major focus of this research. For this purpose, five data sets collected in accordance with the Tier II metrics are presented and analyzed. It can be concluded from this research that the Tier II Strategy Implementation Index is a viable and easy-to-use tool for immediate use in the industry. Recommendations for future research and users of the index are provided. The Tier II Work Force Strategy has the potential to resolve the current work force problems and foster a better work force environment in the future.

Cho, Y-K (2000) Human-assisted rapid workspace modeling for construction equipment operations, Unpublished PhD Thesis, , The University of Texas at Austin.

Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration, Unpublished PhD Thesis, , The University of Texas at Austin.

France-Mensah, J (2019) Integrated planning and budget allocation for highway maintenance, rehabilitation, and capital construction projects, Unpublished PhD Thesis, , The University of Texas at Austin.

Gebken, R J, II (2006) Quantification of transactional dispute resolution costs for the United States construction industry, Unpublished PhD Thesis, , The University of Texas at Austin.

Glover, R W (1972) Developing and upgrading minority construction contractors: The Houston and Atlanta experiences, Unpublished PhD Thesis, , The University of Texas at Austin.

Goodrum, P M (2001) The impact of equipment technology on productivity in the United States construction industry, Unpublished PhD Thesis, , The University of Texas at Austin.

Griffith, A F (1997) Team alignment during pre-project planning of capital facilities, Unpublished PhD Thesis, , The University of Texas at Austin.

Hamilton, M R (1994) The relationship between pre-project planning effort and success for capital construction projects, Unpublished PhD Thesis, , The University of Texas at Austin.

Jung, Y (1997) Information systems planning methodology for the construction industry, Unpublished PhD Thesis, , The University of Texas at Austin.

Kim, D (2002) Exploratory study of lean construction: Assessment of lean implementation, Unpublished PhD Thesis, , The University of Texas at Austin.

Kim, D Y (2011) Construction planning and execution strategies for enhancing project success on electrical construction subcontracts, Unpublished PhD Thesis, , The University of Texas at Austin.

Kim, S B (2002) Assessment of CII knowledge implementation at the organizational level, Unpublished PhD Thesis, , The University of Texas at Austin.

Laufer, A (1980) Assessment of financial incentive programs for the construction labor force: A Delphi analysis, Unpublished PhD Thesis, , The University of Texas at Austin.

Lopez de Ortigosa, D A (1993) Forecasting construction costs in hyper-inflated economies, Unpublished PhD Thesis, , The University of Texas at Austin.

McNerney, M T (1994) The use of geographical information systems for airport engineering and management, Unpublished PhD Thesis, , The University of Texas at Austin.

Pantelias, A (2009) A methodological framework for probabilistic evaluation of financial viability of transportation infrastructure under public private partnerships, Unpublished PhD Thesis, , The University of Texas at Austin.

Panthaworn, P (2005) An exploratory study of motivation of management personnel in the heavy construction industry, Unpublished PhD Thesis, , The University of Texas at Austin.

Phaobunjong, K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects, Unpublished PhD Thesis, , The University of Texas at Austin.

Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques, Unpublished PhD Thesis, , The University of Texas at Austin.

Seo, J (1998) Graphical interface design for equipment control in unstructured environments, Unpublished PhD Thesis, , The University of Texas at Austin.

Shaw, D T (1989) SITE CODE: A knowledge-based model of municipal site development regulations for computer-aided design, Unpublished PhD Thesis, , The University of Texas at Austin.

Song, J (2005) Tracking the location of materials on construction projects, Unpublished PhD Thesis, , The University of Texas at Austin.

Sylvie, J R (2005) Developing best practices for industrial project life cycle security and a methodology for measuring implementation, Unpublished PhD Thesis, , The University of Texas at Austin.

Toews, C D (1981) The regional economic and labor market impact of large-scale, rural, public works construction: A case study of the McClellan-Kerr Arkansas River Navigation System, Unpublished PhD Thesis, , The University of Texas at Austin.

Wilde, W J (1998) Life cycle cost analysis of portland cement concrete pavements, Unpublished PhD Thesis, , The University of Texas at Austin.

Wilson, M C (2000) Public infrastructure investment and structural economic change: The spatial dynamics of public works in the United States, Unpublished PhD Thesis, , The University of Texas at Austin.

Won, S (2002) A model for work function characteristics-based prioritization of technologies for capital projects, Unpublished PhD Thesis, , The University of Texas at Austin.

Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration, Unpublished PhD Thesis, , The University of Texas at Austin.

Zhang, Z (1996) A gis-based and multimedia integrated infrastructure management system, Unpublished PhD Thesis, , The University of Texas at Austin.